|
|
|
Constructed in 2003 |
|
|
Entering from the main hall of the Harlow Street complex at the start of construction. |
|
|
Looking down the main hall of The Fire Works before any walls are constructed. Studios are on the left (windows) and right (interior). Straight back will be the glaze room (right) and kiln room (left). |
|
|
Looking the other way, from the glaze room, after external walls have been framed. Locations of studio walls are taped on floor. |
|
|
A look at one studio (two windows) taped-off for construction. |